With length (m) 5, width (m) 3, depth (m) 0.15, extra allowance (%) 5, the concrete to order is 2.363 m³.
| Length (m) | 5 |
|---|---|
| Width (m) | 3 |
| Depth (m) | 0.15 |
| Extra allowance (%) | 5 |
| Concrete to order | 2.363 m³ |
|---|---|
| Basic volume | 2.25 m³ |
| Extra allowance | 0.113 m³ |
Amounts are shown in US dollars for illustration. Choose your own currency in the calculator above; it labels amounts and does not convert them.
Enter rectangular dimensions in metres. Allowing extra for waste is useful, but shape irregularities and engineering requirements need separate attention.
Try changing one input at a time. The live result helps you see which assumption has the greatest effect.
Use Save scenario A, change an input, and compare both results side-by-side. You can also share your settings using a link.
Concrete (m³) = length (m) × width (m) × depth (m). Enter rectangular dimensions in metres. Allowing extra for waste is useful, but shape irregularities and engineering requirements need separate attention.
With length (m) 5, width (m) 3, depth (m) 0.15, extra allowance (%) 5, the concrete to order is 2.363 m³. Basic volume: 2.25 m³; Extra allowance: 0.113 m³.
This is an estimate based on the inputs and assumptions shown on this page, not professional advice. Check anything with financial, health or safety consequences independently.
Yes. Calculations run in your browser and your numbers are not sent to a server. A share link contains the inputs you choose to share, so check it before sending it to anyone.